Home
Ningbo Eastern New City recycling half of the core area of use of underground space
source 2012-7-4 9:21:48
The first five-star hotel of the eastern part of Metro Plaza East Howard Johnson hotel in the newly opened three-tier underground parking garage, the owner can not see the ground, easy access to a destination of the financial center. The eastern part of Metro as Ningbo underground space development of the most important areas, its core area of 8.5 square kilometers of land, about half the core area of the underground construction area contiguous to form a network, the characteristics of the system layout, and showing, not only in the domestic the leading position in the international.
East City controlled detailed planning of underground space "in 2007 by world-renowned Japan Co., Ltd. Nikken Sekkei company prepared and approval. According to the plan, Metro core area of utilization of underground space policy of focusing on the moderate development, security and additional floor space through the underground space use, and to identify the key areas of underground space development.
The eastern part of Metro underground space development in key areas and content include: Ming An Road, Central Business District to NingChuan Road underground space development, rather wear Lu Haiyan Lu two rail transit transfer station near the underground space development, Tong River north of the regional administrative office area of underground space development, NingChuan Road and Jiang Cheng Road, part of the section of road underground. Due to the two urban rail line from the ground through the eastern part of Metro range planning, planning, part of the track site layout of the underground commercial street and pedestrian access.
The Central Business District is the region with the highest development of underground space is the most comprehensive, strength. Which, the Central Plaza, a two-tier parking lot, with a total construction area of 60,000 square meters; Central Park ground
- Details
- Category: Ningbo News
Read more: Ningbo Eastern New City recycling half of the core area of use of underground space
Ningbo elected as secondary financial centre for the 3rd time
The third China Financial Centre Index (CDI·CFCI3) was released in Shenzhen this week. Ningbo ranks 13th in terms of comprehensive competitiveness and this is the third consecutive year that Ningbo has been included in the list. According to the list, the final ranking of the comprehensive competitiveness is as follows, Shanghai, Beijing and Shenzhen take up the first three places. Then come Guangzhou, Hangzhou, Nanjing, Tianjin, Dalian, Chengdu, Suzhou, Wuhan, Shenyang, Ningbo, Chongqing, Xi'an, Xiamen, Jinan, Qingdao, Changsha, Zhengzhou, Fuzhou, Kunming, Wuxi, Hefei, Nanchang, Changchun, Wenzhou, Harbin and Shijiazhuang. It can be clearly seen from the three years' listing that the competitiveness of Chinese financial centres shows a disparity among cities. Generally speaking, Chinese financial centres fall into three categories. The first level can be referred as national financial centres, including Shanghai, Beijing and Shenzhen. They are all national financial centres with influence and radiating power. This year's list sees for the first time that these three cities won all the first three places in all indicators of the list. For example, Shanghai ranks number one from the perspective of financial performance and the scale of financial market, and Beijing ranks number one in strength of financial institutions and eco-environment of finance. With its excellent eco-environment of finance and financial performance, Ningbo falls into the second level, that is, major regional financial centres. According to the list, besides Ningbo, Guangzhou, Hangzhou, Dalian, Nanjing and Tianjin are all included in the second level, as they are regional financial centres with regional influence and radiating power. Some other cities in the list, including Shenyang, Zhengzhou, Wuhan, Chengdu, Fuzhou, Changsha, Xiamen, etc, are placed in the third level as minor regional financial certres
- Details
- Category: Ningbo News
Ningbo Electric Power Company issued proposal for power use
#ningbo #expat #news #china
One million pieces of Recommendation Papers for Households issued by State Grids Ningbo Electric Power Company have been delivered to the hands of every citizen since February 28. The company has been issuing this kind of guidelines for using electricity solely to citizens for five consecutive years.
The paper not only tells the electricity quantity and charge of 2014 but also contains information including the total electricity consumption, charge, average monthly consumption and the average charge of the whole year. Besides, it also gives a clear picture of the information such as the monthly electricity consumption, consumption between on-peak and off-peak times, proportion of off-peak consumption, ladder-type consumption and average electricity price.
Meanwhile, the paper also gives correspondent advice to every citizen of how to use on-peak and off-peak electricity as well as the proportion of using electricity during off-peak times. Good suggestions were also sent to the households which have a bigger demand for electricity consumption and used the electricity of ladder 2 and 3. Apart from these, it also introduces some of the practical information about the policy of ladder-type electricity prices, ways of preventing an electric shock and investigating the power-off on one’s own.
- Details
- Category: Ningbo News
Ningbo electricity load hit record high
In the hot days, the city electricity load grows rapidly. At 1:27 pm. on August 4th, the electricity load of Ningbo reached 10.42 million KW, hitting a record high. During the ten days of continuous high temperature, the daily maximum electricity load keeps around 10 million KW. Till August 3rd, Ningbo's accumulative total electricity of 2015 has reached 29.148 billion KWH, up 2.34% from a year earlier.
It is reported that with the improvement of power generation capacity of Zhejiang Province and increase of power supply from other provinces, power supply capability of Ningbo has been greatly promoted. According to the largest power supply capacity of Zhejiang Province, Ningbo's power supply capacity maintains around 12 million KW, reaching an overall balance between power supply and demand.
At present, Ningbo has six 500-KV substations containing 17 sets of main transformers with capacity of 15.4 million KVA, forty-six 220-KV substations containing 105 sets of main transformer with capacity of 20.43 million KVA and one hundred and eight-nine110-KV substations containing 392 sets of main transformer with capacity of 18.02 million KVA
- Details
- Category: Ningbo News
Page 871 of 1699