Home
Rail Transit Line No.4 starts construction
With the first shovel of earth at the Cuibaili Station, the Rail Transit Line No.4 started construction officially on the morning of November 30. From the Cicheng Station to the Dongqian Lake Station, the line runs from the northwest to the southeast, connecting the central urban area, the eastern new town and the surrounding areas. With a total length of 35.95 kilometers, the line has 24.45 kilometers underground, 11.2 kilometers overhead and 0.3 kilometer for transition. The part between the starting Cicheng Station and the Guangsha Yiting Station is overhead, that between the Guangshan Yiting Station to the Zhuangqiao Station is the transition section, and that between the Zhuangqiao Station and the Dongqian Lake Station is underground. There are 25 stations, with 18 underground (two completed) and 7 overhead (four completed), and the average station distance is 1.49 kilometers. There are six transfer stations, the Daqing Bridge Station connecting Rail Transit Line No.1, the Railway Station connecting line No.2, the Children's Park Station connecting line No.3, the Xuefu Road Station connecting line No.5, the Cuibaili Station connecting line No.6, and the Dongqian Lake Avenue Station connecting line No.7. The construction will last for five years, and the integration part of the north viaduct has completed, including the four elevated stations. The transfer stations of the line have started the design and construction stage ahead of other stations.
- Details
- Category: Ningbo News
Railway East Station yesterday reproduction train a large area of late
Source 2012-7-18 9:14:40 Southeast Business
Railway East Station on the bulletin board, a lot of trains varying degrees of late. Reporter Fan Hongshe
"Late yesterday, a lot of friends send microblogging about Ningbo Railway East Station car hit the train a large area of delayed things. The reporter noted, Ningbo, Wenzhou, Fuzhou, around the station, train delays of varying degrees. Following last Friday Yong isotherm EMU large area of delayed re-emergence of the train a large area of delayed, Ningbo, east to Chengdu K422 train was delayed more than eight hours.
Reporter FAN Hong
Noon yesterday, the reporter to the East Railway Station to interview, train delay continues. D3104 times 24 minutes late, D3113 83 minutes late, D5587 44 minutes late, D3213 69 minutes late; pitted aspects K1219 Nanchang to Ningbo train 38 minutes late, the Z9 Beijing to Ningbo Train 144 minutes late. Rough count, about 15 trains with varying degrees of late bound Wenfu Shanghai, Xiamen, the direction of the majority of EMU.
The longest delay to the number of K422 in Ningbo, east to Chengdu train, originally planned 8:08 departure from Ningbo East, until more than 16 o'clock start, late, more than eight hours.
Yang, to take the train K422 to return home to take care of her sick daughter, and see the car the delay can not be opened, he anxiously: "home located in a remote, in addition to the train, by car is very inconvenient, now only anxious ..." Mr. Yang full face red. For this problem, the station staff can only express frustration.
- Details
- Category: Ningbo News
Read more: Railway East Station yesterday reproduction train a large area of late
Railway on July 1 implementation of the new operation diagram
Source 2012-6-26 9:09:10 Southeast Business
Ningbo Railway Service Depot yesterday's news release: at 0:00 on the July 1st, including the stations of Shanghai Railway Bureau railway Ningbo East standing within the implementation of the new train operation diagram.
Reporter FAN Hong correspondent Li Yiqing
The biggest bright spot of the adjustment of the train operation diagram is an extension of the coastal railway south there. D3117/D3118 train running section in the opening line of the Shanghai Hongqiao to Xiamen North changed to Nanjing Longyan trips changed D3135/D3136. This train after the Ningbo Railway East Station, which means Ningbo public to ride the EMU south as far to Longyan City, Fujian Province, extends over 150 kilometers than the original. Ningbo to Longyan, the running time of 6 hours and 45 minutes. Over Xiamen North of the trip EMU will also be docked in Zhangzhou, in Nanjing, the famous Nanjing Earth Building "is located in Nanjing County. Destination Longyan in Fujian and Guangdong and Jiangxi provinces, at the junction of the former site of famous Kutian meeting, Hakka Earth Building.
CDB Nanchang to Ningbo East 2534/3 trains will be replaced by a fast passenger train (K prefix), trips for the K1218 / K1220/17 times, train running at all times and along the docking station remained unchanged, the fare hard seat 106 yuan raised to 120 yuan from 202 yuan raised to 216 yuan, hard sleeper from.
There are two trains of passengers up and down sites have changed: D5586 Hangzhou, Wenzhou, south to increase the the Taizhou station stops, D379 times Shanghai Hongqiao to Fuzhou South to increase the the Shaoxing station stops.
In addition, there are some trains run time along a slight adjustment, but the change is not great.
Nanjing Longyan EMU timetable
- Details
- Category: Ningbo News
Read more: Railway on July 1 implementation of the new operation diagram
Rapid growth of enterprises in Ningbo Meishan Free Trade Zone
According to Beilun industrial and commercial administrative department, Ningbo Meishan Free Trade Zone has 1,024 enterprises, whose registered capital totaling 1.06 billion yuan. These enterprises are engaged in such businesses as construction, real property, trade, logistic, investment management, electronic products, petrol and coal. There are 163 companies whose registered capital each reaches 10 million yuan. Meishan Island has superb coastal resources. The coastal line is 22.5 km long, with the greatest depth reaching 22 meters. With these conditions, the island is perfect for deep-water wharfs. The Meishan Port is 15 km long, 5 meters wide and 9 meters deep. The port has perfect coastal resources and deepwater berths for any large container ships in the world. At present, Port of Ningbo navigates to over 600 ports in over 100 countries and regions. The annual cargo-handling capacity reaches 345 million tons, ranking the 2nd in Mainland China. The containers it handles in a year amounts to 9,350,000 TEUs, ranking the 4th in China. With the rapid integration of Ningbo-Zhoushan Port, the port of Ningbo is expanding its services and its cargo-handling capacity. This is a solid foundation for the development of the enterprises in Ningbo Meishan Free Trade Zone. Thanks to the perfect resources and infrastructural facilities, a large number of enterprises are settled in the zone. So far, the zone has 21 enterprises whose registered capital each reaches over 100 million yuan. A number of enterprises of logistic services, shipping and raw materials have chosen Meishan. Statistics show that Meishan has 9 raw materials enterprises whose registered capital each is above 50 million yuan.
- Details
- Category: Ningbo News
Page 810 of 1699